摘要
本文介绍了一种在2×600MW超临界抽凝供热发电机组上实现的、基于双主站网络控制的新型双层等离子点火系统,分析了该双主站结构的网络拓扑模式相对于原有主从交互式结构的网络拓扑模式的优势,详细描述了该方案的具体实施过程,并给出了该方案在电厂的实施效果。
This paper introduces a new double plasma ignition system implemented in2×600MW supercritical extraction condensing heating unit,based on dual master station network control.It describes the network topology model of the dual master structure compared to the original model of master-slave network topology structure.The implementation process of the project as well as its performance in power plant are illustrated.
作者
王兆虎
黄珊琳
Wang Zhaohu;Huang Shanlin(Fujian Hongshan thermoelectricity Co.,Ltd.,Shishi 362700,China)
出处
《石化技术》
CAS
2017年第10期81-82,共2页
Petrochemical Industry Technology
关键词
双层等离子点火
双主站网络
电源切换
double layer plasma ignition
dual master station network
power switching