主平硐在不间断运输下的局部改造

Construction Technology of Large Cross-section Drive Chamber Constructed out of Local Main Chamber under Uninterrupted Transportation Conditions
下载PDF
导出
摘要 塔山矿主平硐中部驱动硐室是在已投入使用的主平硐及三联巷局部进行挑顶刷帮改造而成。为确保硐室施工不影响矿井正常生产,该硐室施工方案需充分考虑主平硐的设备设施保护以及施工空间受限等问题,故不同于一般的硐室施工方法。本文就塔山矿主平硐中部驱动硐室的特殊施工方法进行了总结,以期为类似条件下的硐室施工提供借鉴。 The middle drive chamber of main chamber in Tashan Mine is constructed out of cutting the top andbrush the sides in the main chamber has been put into use and local triple roadway.In order to ensure that theconstruction of the chamber does not affect the normal production of the mine,the construction plan of the chambershould take into account the problems such as the protection of the equipments and facilities of the main chamber andthe limited construction space,therefore,it is different from the general chamber construction method.In this paper,thespecial construction method of the middle drive chamber of main chamber in Tashan Mine is summarized,with a view toprovide the reference for the chamber construction under the similar conditions.
作者 缪志炳 Miao Zhibing(Datang Tashan Coal Mine Co., LTD., Datong Coal Mine Group, Datong 037000, China)
出处 《同煤科技》 2017年第5期12-15,共4页 Datong Coal Science & Technology
关键词 煤矿硐室施工 主平硐 局部刷扩 construction of mine chamber main chamber partial brush expansion
  • 相关文献

参考文献1

二级参考文献3

  • 1运输机械设计选用手册[M].北京:化学工业出版社,1999.
  • 2北京有色冶金设计研究总院.机械设计手册[M].北京:化学工业出版社,1993.
  • 3中国煤炭建设协会.GB50215-2005煤炭工业矿井设计规范[S].北京:中国计划出版社,2005.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部