摘要
结合武汉东湖通道实际工程,对地基处理方法进行了分析,并将国内常用地基处理方法进行类比,归纳出各方法适用范围、条件以及异同点,从而解决了实际工程地基处理方法的选择问题。
Combined with the examples of the east lake tunnel,analysis of the ground treatment methods.List several methods of ground treatment which were popularly adopted in China,and compare those methods to make a conclusion that what scope those method could be used,the conditions and similarities.Thus,the choice of the ground treatment methods in the actual project was solved.
作者
周斌
ZHOU Bin(China University of Geosciences(Wuhan),Wuhan 430074,China)
出处
《四川建材》
2017年第11期109-110,共2页
Sichuan Building Materials
关键词
东湖通道
地基处理
水泥土搅拌法
高压旋喷桩
the east lake tunnel
cround treatment
cement mixing method
high pressure jet grouting pile