摘要
以佛山西地下空间开发项目地铁车站为例,将BIM技术应用到本项目管线综合设计中,利用Revit软件完成各专业系统建模,利用Navisworks软件分析各个专业之间的碰撞冲突并生成碰撞冲突报告,通过管线综合调整优化模型,提高设计质量;还对综合支吊架在BIM中的应用进行了探索。地铁车站机电设备管线设计及施工中,应注重管线综合布置技术并合理的使用管道综合支吊架。
This paper use Fo Shanxi project of exploitation of underground space in subway station as an example,BIM Technology is applied to the design of comprehensive pipeline,using Revit software to complete the system modeling,using NavisWorks software to analyze various professional between collision and generate collision report,through the pipeline of comprehensive adjustment and optimization model,improve the quality of design.This paper also searchs on the application of comprehensive support and hanger in BIM.In Subway station electromechanical equipment and pipeline’s design and construction,we should pay attention to the comprehensive pipeline technology and reasonable use consolidated piping support and hanger.
出处
《洁净与空调技术》
2017年第2期45-49,共5页
Contamination Control & Air-Conditioning Technology
关键词
BIM技术
管线综合
碰撞检查
综合支吊架
BIM technology
Pipeline Comprehensive
Collision check
Comprehensive support