期刊文献+

BIM技术在地铁车站管线综合设计中的应用 被引量:9

Application of BIM Technology in the Subway Station's Comprehensive Pipeline
下载PDF
导出
摘要 以佛山西地下空间开发项目地铁车站为例,将BIM技术应用到本项目管线综合设计中,利用Revit软件完成各专业系统建模,利用Navisworks软件分析各个专业之间的碰撞冲突并生成碰撞冲突报告,通过管线综合调整优化模型,提高设计质量;还对综合支吊架在BIM中的应用进行了探索。地铁车站机电设备管线设计及施工中,应注重管线综合布置技术并合理的使用管道综合支吊架。 This paper use Fo Shanxi project of exploitation of underground space in subway station as an example,BIM Technology is applied to the design of comprehensive pipeline,using Revit software to complete the system modeling,using NavisWorks software to analyze various professional between collision and generate collision report,through the pipeline of comprehensive adjustment and optimization model,improve the quality of design.This paper also searchs on the application of comprehensive support and hanger in BIM.In Subway station electromechanical equipment and pipeline’s design and construction,we should pay attention to the comprehensive pipeline technology and reasonable use consolidated piping support and hanger.
作者 余元波 Yu Yuanbo
出处 《洁净与空调技术》 2017年第2期45-49,共5页 Contamination Control & Air-Conditioning Technology
关键词 BIM技术 管线综合 碰撞检查 综合支吊架 BIM technology Pipeline Comprehensive Collision check Comprehensive support
  • 相关文献

参考文献1

二级参考文献2

共引文献22

同被引文献25

引证文献9

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部