摘要 对于软土地基斜坡堤,排水固结、反压平台和加筋层等措施已成为解决整体稳定问题的有效方法。平湖九龙山西沙湾景观配套二期工程的海堤位于软土地基上,堤身高度大,且堤前存在1∶3.5的陡坡,不具备采用反压平台的条件,而完全采用排水固结和加筋层措施,不能经济地解决整体稳定性问题。在堤前增设抗滑桩,有效而经济地解决了整体稳定性问题。 In the design of sloping dike on silt foundation,drain consolidation,overburden layer and geobelt-reinforced cushion are effective solutions to solve the stability problem.The sloping dike in Pinghu Jiulong Mountain complement land-scape second-stage construction locates on silt foundation,with high elevation and steep slope of1:3.5in front of the dike.Overburden layer is not suitable under this condition.The stability of the dike can’t be solved economically through drain consolidation and geobelt-reinforced cushion.So,slope-resistant piles are used to improve the dike stability effectively and economically.
作者 项雨略 彭维雄 马兴华 XIANG Yu-lue;PENG Wei-xiong;MA Xing-hua(Shanghai Waterway Engineering Design and Consulting Co., Ltd., Shanghai 200120, China)
出处 《水运工程》 北大核心 2017年第11期161-166,共6页 Port & Waterway Engineering
关键词 抗滑桩 陡坡 斜坡堤 稳定性 slope-resistance piles steep slope sloping dike stability
  • 相关文献

参考文献2

二级参考文献11

  • 1张敬,叶国良.土工合成材料在黄骅港的应用[J].水运工程,2006(1):40-43. 被引量:4
  • 2《土工合成材料工程应用手册》编委会.土工合成材料工程应用手册[M].北京:中国建筑工业出版社,2000.509-557.
  • 3JTJ239-2005,水运工程土工合成材料应用技术规范[S].
  • 4中交上海航道勘察设计研究院有限公司.乐清湾港区一期南区围(海)涂工程施工图设计说明及施工技术要求[R].上海:中交上海航道勘察设计研究院有限公司,2007.
  • 5JGJ94-94.建筑桩基技术规范.[S].,..
  • 6GB50286-98.堤防工程设计规范.[S].,..
  • 7YB9258-97.建筑基坑工程技术规范.[S].,..
  • 8JTJ013-95.公路路基设计规范.[S].,..
  • 9DBJ08-61-97.基坑工程设计规程.[S].,..
  • 10JTJ250-98 港口工程地基规范