期刊文献+

Enlightenment brought by the ahead-of-schedule implementation of Yangtze River Delta ECA

下载PDF
导出
摘要 From November 2015, the Ministry of Transport published the Implementation Plan of Ship Emission Control Area in the Pearl River Delta, Yangtze River Delta and Waters around Bohai Sea (Beijing-Tianjin-Hebei) (hereinafter referred to as the“Implementation Plan”). By September 1 this year,the regulation that “vessels should use fuel with sulfur content no more than 0.5% m/m when berthing at all ports within ECA” was implemented 4 months in advance.
作者 LiuXiao
机构地区 不详
出处 《中国船检》 2017年第11期110-111,共2页 China Ship Survey
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部