7Khan F N, Lau A P T, Li Zhaohui. Statistical analysis of opti cal signal-to-noise ratio monitoring using delay-tap sampling[J], IEEE Photonics Technology Letters, 2010. 22(3): 149-151.
8Hinow M, Mevissen M. Substation maintenance strategy adap- tation forlife-cycle cost reduction using genetic algorithm [J]. IEEE Transactions on Power Delivery. 2011, 26 (1) : 197-204.
9Nilsson J, Bertling L. Maintenance management of wind power systems using condition monitoring systems--life cycle cost a nalysis for two case studies[J]. IEEE Transactions on Energy Conversion, 2007, 22(1): 223-229.
10Karlsson D, Wallin L, Olovsson H E, et al. Reliability and life cycle cost estimates of 400 kV substation layouts[J]. IEEE Transactions on Power Delivery, 1997,12(4): 1486-1492.