摘要
深基坑施工课程教学中存在许多难以表达的施工进度模拟过程。BIM技术具有三维可视化和信息集成管理等优势。将其引入到深基坑施工课程教学中,介绍整个课程的目标和课程组织形式,基于BIM技术构建施工进度管理中的应用框架体系和流程,且在背景工程的基础上,建立4D深基坑模型并生成施工模拟动画,对深基坑施工课程教学进行了一定的创新实践,使学生能更加直观生动理解并掌握深基坑施工的进度管理体系与施工流程。
For the teaching of deep excavation construction,there are many simulation processes of construction progress that are difficult for expression.The BIM technology possessesmany advantages including3D visualization and information management integration.This paper applies the BIM technology in the teaching of deep foundation pit construction,and introduces theobjectives and the organization form of the course.The BIM technology is applied to establish the framework and process of construction schedule management,and to builda4D deep excavation model andtogenerate construction simulation animation with the background engineering.Some practices have been organized for the innovation of the teaching of deep excavation construction course,which promote the students to understand and master the progress management system and the construction process of deep excavation construction more intuitively and vividly.
作者
饶平平
张筱骏男
张朝阳
Rao Pingping;Zhang Xiaojunnan;Zhang Chaoyang(Department of Civil Engineering,University of Shanghai for Science and Technology, Shanghai 20093, China;Shanghai Tongzhu Information and Technology Co., Ltd., Shanghai 200090, China)
出处
《土木建筑工程信息技术》
2017年第5期79-83,共5页
Journal of Information Technology in Civil Engineering and Architecture
基金
上海理工大学教师教学发展研究重点项目(CFTD17011Z)
上海市浦东新区城市建设科技委资助项目"BIM及有限元技术在深基坑开挖工程中的应用研究"(项目编号:11)
关键词
BIM技术
深基坑施工
课程
教学
BIM Technology
Deep Excavation Construction
Course
Teaching