摘要
完整准确的文档资料是工程项目运行、维护、检修、管理、改建的重要参考性文件。对厄瓜多尔水电站工程工作实践经验进行了分析,通过项目文档资料的收集、整理、归档工作经验进行研究,海外水电工程项目文档管理的编制和整理提供参考,提高档案利用效率及国际工程的整体水平。
Complete and accurate documentation is an important reference document for the operation,maintenance,overhaul,management and reconstruction of engineering projects. On the construction of the ecuador hydropower station work experience were analyzed,through the project documentation collection,sorting and filing work experience in research,provide the reference documentation management of overseas hydropower project and finishing,to improve the overall level of efficiency and international engineering archives.