摘要
在工程量清单计价模式下,暂估价已广泛应用于工程实践,对工程造价的控制起到了积极作用。然而,暂估价在应用过程中存在一些问题,影响工程造价的有效控制。文章通过相关文献的研究,提出了暂估价项目列项的四大原因和五大问题,并针对这些问题进行分析和提出对策建议。
In the mode of the bill of quantities,prime cost sum has been widely used in engineering practice,and it plays a positive role in the project cost control However,prime cost sum has some problems affecting the effective control of the project cost in the application process Through the literature research,this paper puts forward four reasons and five problems about prime cost item,and then puts forward some suggestions to solve these problems
作者
白娟
蒋志国
BAI Juan;JIANG Zhiguo(School of Management Science and Engineering, Anhui University of Technology, Maanshan 243002;Shen Zhen LiYuan Water Design & Consultation Co ,Ltd, Shenzhen 518000)
出处
《福建建筑》
2017年第12期92-94,共3页
Fujian Architecture & Construction
基金
安徽工业大学2016年度校青年教师科研基金(QS201606)
关键词
暂估价
问题
对策
Prime cost item
Problems
Suggestions