摘要 泰安市第四污水处理厂采用改良的AAO工艺处理城市污水。建成后于2016年2月1日开始进水调试,于2016年6月20日顺利调试结束,水质达到一级A排放标准。调试初期,由于水温较低,活性污泥的培养驯化速度比较慢,出水效果不理想,在调试后期,随着水温的上升,出水的COD、BOD_5、氨氮、总磷及SS的值均达到设计标准。 Tai’an Fourth Sewage Treatment Plant adopts a modified AAO process to treat municipal wastewater.Upon completion of the project,water commissioning will begin on February1,2016and will be successfully commissioned on June20,2016.The water quality will meet Grade I A emission standards.In the early stage of commissioning,due to the low water temperature,the culture and acclimation of activated sludge was slow and the effluent effect was not satisfactory.In the later stage of commissioning,the effluent COD,BOD5,ammonia nitrogen,total phosphorus and SS reached the design as the water temperature increased standard.
作者 杨福广 Yang Fuguang(Urban Drainage Management Office of Tai’an City, Tai’an Shandong 271000,China)
出处 《环境与发展》 2017年第10期84-85,共2页 Environment & Development
关键词 AAO 调试 污水处理 AAO Debugging Sewage treatment
  • 相关文献

参考文献2

二级参考文献13

共引文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部