2台增压风机并联的锅炉脱硫脱硝系统调试及投运方案

Debugging and commissioning of boiler desulphurization and denitration system with two parallel booster fan
下载PDF
导出
摘要 介绍了燃煤锅炉烟气脱硫脱硝装置的烟气流程、增压风机配置及控制。针对脱硫脱硝系统中出现的2台增压风机并联不同步开启、锅炉引风机与增压风机协调运行及2台锅炉不同步投运等难点问题,制定了增压风机控制和投运方案,成功实现2台增压风机与2台燃煤锅炉联合稳定投运。 The flue gas flow,booster fan configuration and control of flue gas desulphurization and denitration device in coal fired boiler are described.Aiming at unability to simnltaneous running of two parallel booster fan in desulphurization and denitration system,the coordinated operation of boiler induced draft fan and booster fan,and the two boilers were not put into operation at the same time.A scheme of booster fan control and commissioning was established,achieving two booster fans and two coal fired boilers combined operation and stability successfully.
作者 于小慢 YU Xiaoman(China Nerin Engineering Technology Co., Ltd, Nanchang, Jiangxi, 330031, China)
出处 《硫酸工业》 CAS 2017年第11期29-32,共4页 Sulphuric Acid Industry
关键词 燃煤锅炉 脱硫 脱硝 增压风机 并联 协调 控制 coal fired boiler desulphurization denitrification booster fan parallel coordinated control
  • 相关文献

参考文献3

二级参考文献12

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部