摘要
印尼白水水电站挡水闸楼板在施工过程中应用了预埋件配合工字钢搭设施工平台的方式进行楼板混凝土浇筑,代替了原有的搭设满堂红脚手架作为施工平台的方式。该方案可以有效地缓解资金积压和避免周转性材料过多的现象,降低施工成本,并且施工过程中质量、安全可以进行有效控制。
Replace the original full space scaffold,the coordination of embedded part and I-beam are used to build construction platform in the construction of the pouring of the concrete slab for the floor slab of sluice gate of Baishui hydropower station in Indonesia.This program could effectively reduce the fund backlog and avoid the excessive turnover material to reducing the construction costs,and the quality and safety in the process of construction can be effectively controlled.
出处
《东北水利水电》
2018年第1期20-21,共2页
Water Resources & Hydropower of Northeast China
关键词
挡水闸
楼板
施工技术
白水水电站
sluice gate
floor slab
construction technology
Baishui hydropower station