某矿空场法开采嗣后充填采空区稳定性分析 被引量:1

Stability Analysis of the Stowed Goaf after Open-Stope Mining
下载PDF
导出
摘要 结合某矿采用分段空场法开采,嗣后全尾砂胶结充填采空区的生产实际,利用FLAC-3D软件建立了三维数值模型并进行数值模拟计算,对充填前后采空区围岩应力、位移进行比较分析,揭示了嗣后全尾砂胶结充填对采空区稳定性的影响机理,对类似矿山采空区治理具有重要的指导意义。 One mine was explored with open-stope method and then the goaf was filled with cementedtailings only.The author built a three-dimensional numerical model with FLAC-3D for numerical simulationcalculation,compared andanalyzed the surrounding rock stress and the displacement of the goaf before and after the filling,and revealed the influence mechanism of the filling of cemented tailings only upon the stability of the goaf.It has important guiding significance for goaf treatment in similar mines.
作者 王春华 WANG Chunhua(Guangdong Metallurgical and Architectural Design Institute, Guangdong, Guangzhou 510080, China)
出处 《有色冶金设计与研究》 2017年第6期21-23,共3页 Nonferrous Metals Engineering & Research
关键词 胶结充填 FLAC-3D 数值模拟 稳定性分析 cemented filling FLAC-3D numerical simulation stability analysis
  • 相关文献

参考文献5

二级参考文献37

共引文献169

同被引文献6

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部