阳西电厂2×1240 MW机组热机设计方案研究

Research on Mechanical Design Features of 2×1240 MW Unit for Yangxi Power Plant
下载PDF
导出
摘要 详细论述了广东华厦阳西电厂二期工程2×1240 MW超超临界发电机组热机专业的热力系统方案设计研究、主厂房布置设计及主辅机配置设计方案研究,阐述了建设国内首批超600℃、1200 MW等级超超临界机组对于实现我国火力发电技术的突破及对发电设备制造行业的重要意义,可作为同类大容量机组工艺设计借鉴参考。 The thermodynamic system design,the main building layout design,the main and auxiliary equipments configuration design were reviewed in detail for Guangdong Yangxi power plant2×1240MW ultra supercritical units,which expound the important significance of the construction of the first domestic over600℃and1200MW grade ultra supercritical units,it achieves the breakthrough of Chinas thermal power generation technology and thermal power technology manufacturing industry.The design can be used as a reference for similar large capacity units design.
作者 邓宏伟 梁展鹏 胡琨 DENG Hongwei;LIANG Zhanpeng;HU Kun(ChinaEnergy Engineering Group Guangdong Electric Power Design Institute Co.,Ltd.,Guangzhou 510663,China))
出处 《南方能源建设》 2017年第4期37-41,共5页 Southern Energy Construction
基金 中国能建广东院科技项目:GEDI百万超超临界电厂设计导则(EV00591W)
关键词 1 240 MW 超超临界 系统 布置 1 240 MW ultra-supercritical system layout
  • 相关文献

参考文献11

二级参考文献48

共引文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部