可原谅工期延误对PPP项目收益的影响机理及防范 被引量:1

Influencing Mechanism and Countermeasures of Excusable Delay on Project Income under PPP Model
下载PDF
导出
摘要 为帮助项目公司合理规避收益损失,以PPP项目收益为研究对象,研究了工期延误对PPP项目收益的影响机理;并辅以算例计算可原谅工期延误引起收益的减少值,以验证其影响机理及因素;最后提出合理规避收益减少的防范措施。研究结果表明:(1)PPP项目收益减少的根源在于可原谅工期延误引起的建设期资金成本的增加以及运营期的缩短;(2)防范工期延误造成PPP项目收益的减少,关键在于理清工期延误的责任归属;(3)PPP合同的限定以及建设期对于工期延误事件的及时处理是合理规避收益减少的有效措施。 This paper focuses on the income of PPP project.Choosing one of the factors-extension of time(EOT),this study explores the mechanism of influence of EOT on the income of PPP model,performs example calculations for the decrease of income caused by excusable delay,validates the influencing mechanisms and factors,and proposes preventive measures at last.The study indicates that:①the decrease of income is rooted in the increase of the capital cost and the shortening period of the operation during construction due to EOT;于To prevent the decrease of income caused by excusable delay,the key is to sort out responsibility for the delay of the project;②The restriction of PPP contract terms,timely treatment to construction delay events are effective approaches to controlling the decrease of income of PPP model.The study intends to provide theoretical support for SPV to prevent the decrease of income.
作者 孙春玲 姬玉 SUN Chun-ling;JI Yu(School of Management,Tianjin University of Technology,Tianjin 300384,China)
出处 《价值工程》 2018年第8期4-7,共4页 Value Engineering
基金 国家自然科学基金面上项目(71371137) 国家自然科学基金青年项目(71001078)
关键词 PPP模式 PPP项目收益 工期延误 影响机理 Public-Private Partnership(PPP) the income of PPP project extension of time influencing mechanism
  • 相关文献

参考文献8

二级参考文献141

共引文献791

同被引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部