新武隆隧道2#暗河施工方案研究

Study on Construction Scheme of 2# Underground River in Xinwulong Tunnel
下载PDF
导出
摘要 隧道穿越地下暗河时易发生突水突泥灾害,破坏区域水文环境,影响隧道施工和运营.本文介绍了新武隆隧道2#地下暗河的施工处理技术,详细介绍了该暗河的施工处理方法。该方案取得了较好的效果,对类似工程具有借鉴意义。 Water and mud disastrous event may happen when tunnel passes through underground river,damaging regional hydrological environment and affecting the construction and operation of the tunnel.This paper introduces the construction technology of2#underground river of Xinwulong tunnel.The program has achieved good results,and can provide a reference for similar projects
作者 王辉 王明斌 谢兴富 古腾 聂凯翔 吴勇 WANG Hui;WANG Ming-bin;XIE Xing-fu;GU Teng;NIE Kai-xiang;WU Yong(State Key Laboratory of Geohazard Prevention and Geoenvironment Protection(Chengdu University of Technology),College of Environmental and Civil Engineering,Chengdu University of Technology,Chengdu 610059,China)
出处 《价值工程》 2018年第8期136-137,共2页 Value Engineering
关键词 新武隆隧道 地下暗河 施工处理 Xinwulong Tunnel underground river construction treatment
  • 相关文献

参考文献2

二级参考文献2

  • 1华安增.可缩性工字钢支架[P].中国专利87207098.1987-05-13.
  • 2徐灏.机械手册[M].北京:机械工业出版社,1993.15-30.

共引文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部