期刊文献+

风洞试验对超高层结构及工程造价的影响分析 被引量:3

Analysis of the Influence of Wind Tunnel Test on Super High-rise Building Structure and Construction Budget
原文传递
导出
摘要 建设项目全过程中,设计阶段对工程造价的影响权重较大,设计阶段各专业设计方案合理,基础数据贴近实际情况,可相对有效地控制工程造价。本文简要介绍某超高层建筑风洞试验情况,分析了风洞试验结果数据对超高层结构设计合理性及工程投资可控性的影响。 The process of design is an important factor which has great influence on the construction budget of the project.Professional fundamental logistics calculation data is another important factor for costing.This paper consists of a detailed wind tunnel test result and analytical data based on a super high-rise building.The data helps to give us more precision and accuracy in the plans of the structure and the construction budget of the building.
作者 杨晓华 Yang Xiaohua(China Railway Construction Investment Group Co.Ltd.,Zhuhai Guangdong 519000,China)
出处 《铁道建筑技术》 2017年第9期33-35,46,共4页 Railway Construction Technology
关键词 成本管理 风洞试验 基础参数 结构设计 造价分析 cost management wind tunnel test fundamental parameter structure design cost analysis
  • 相关文献

参考文献2

二级参考文献3

共引文献16

同被引文献18

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部