摘要
2017年2月7日,奥洛维尔大坝的溢洪道发生破坏,目前正在对其进行修复。文章介绍了对主溢洪道和非常溢洪道的修复设计方案、施工进度安排及合同情况等,供参考。
The Oroville dam spillway incident occurred on February7,2017and now recovery is going on.The paper introduces the recovery design for the spillway and emergency spillway,the construction schedule as well as the contracts.
出处
《大坝与安全》
2018年第1期62-66,共5页
Dam & Safety