摘要
以莫桑比克贝拉渔码头重建工程为例,阐述了高桩码头原址重建工程勘察过程中应关注的要点,包括勘察前原码头设计资料收集和勘察区域的障碍物勘探,勘察成果根据原码头的不同区域进行分区统计等,通过分析勘察成果表明不同区域的土性指标、十字板强度、先期固结比等具有明显的差异性,应根据不同区域提供分区统计指标,使设计更符合工程实际。
Taking the reconstruction of fishing wharf project in Beira Mozambique as an example,we discussed the main points of the engineering investigation on the high pile wharf site reconstruction project,including the collection of the former terminal design data and the obstacle exploration in the area before survey,zoning statistics of the survey results according to different areas of the former wharf.The geotechnical index,the vane strength and the over-consolidation ratio are different in different regions by analyzing the survey results and the zoning statistical indicators should be provided according to different regions,making the design more in line with engineering practice.
作者
唐丰礼
许建武
刘天韵
TANG Feng-li;XU Jian-wu;LIU Tian-yun(China Harbour Engineering Co., Ltd. , Beijing 100027, China;CCCC FHDI Engineering Co., Ltd., Guangzhou,Guangdong 510230, China;CCCC Tianjin Port Engineering Institute Co., Ltd., Tianjin 300222, China)
出处
《中国港湾建设》
2018年第3期15-17,23,共4页
China Harbour Engineering
关键词
高桩码头
原址重建
工程勘察
high piled wharf
site reconstruction
engineering investigation