摘要
本文介绍了惠州炼化二期1000万t/a常减压蒸馏装置常压塔塔内件的整个安装过程、遇到的问题及解决方法。
In this paper,the whole installation process,problems and solutions of the inner parts of the atmospheric pressure distillation tower for the two stage 10 million ton/year atmospheric and vacuum distillation unit in Huizhou refining and chemical process are introduced.
作者
朱华
冯柱
罗晓燕
Zhu Hua;Feng Zhu;Luo Xiaoyan(China Petroleum and Natural Gas Sixth Construction Co.,Ltd.,Guilin,Guangxi 541000)
出处
《石化技术》
CAS
2018年第2期22-23,共2页
Petrochemical Industry Technology
关键词
常压塔
塔内件
安装
Atmospheric pagoda
Inner part of the tower
Install