期刊文献+

地铁车辆段过轨给排水管线的设置 被引量:2

The laying ways of the crossing-rail water supply and drainage pipeline of Subway depot
下载PDF
导出
摘要 针对地铁车辆段给排水管线过轨问题,结合工程实例,介绍了过轨给排水管线的常用敷设方式有直接埋地敷设、防护套管敷设、架空敷设、综合管沟敷设,说明了不同敷设方式有其不同的适用范围、敷设要求及优、劣势,必须引起地铁工程设计人员慎重选择。 In view of the crossing-rail problem of water supply and drainage pipelines in subway depot,this paper introduces some common laying ways of crossing-rail water supply and drainage pipelines combine with subway depot projects,which has direct buried laying,protective casing laying,overhead laying,and integrated trench laying.This paper introduces the different applications,laying requirements,advantages and disadvantages of the different methods,which must be carefully selected by subway engineering designers.
作者 杨彩玲 YANG Cailing(Xiamen branch of Beijing Urban Construction Design & Development Group Co., Ltd,Xiamen 361000)
出处 《福建建筑》 2018年第3期57-60,共4页 Fujian Architecture & Construction
关键词 过轨管道 给排水管线 直接埋地敷设 防护套管敷设 架空敷设 综合管沟敷设 Crossing-rail pipeline Water supply and drainage pipeline Direct buried laying Protective casing laying Overhead laying Integrated trench laying.
  • 相关文献

参考文献3

二级参考文献16

  • 1GB50217-2007电力工程电缆设计规范[S].
  • 2GB50268-2008给水排水管道工程施工及验收规范[S].
  • 3TB10621-2009,高速铁路设计规范(试行)[S].
  • 4GB50014-2006室外排水设计规范[S].2005.
  • 5GB50289-98.城市工程管线综合规划规范[S].[S].,..
  • 6TB10008-2006,铁路电力设计规范[S].
  • 7张中和.最新城市道路及地下管线设计手册[M].北京:中国建筑工业出版社,2006.
  • 8GB50187-2012,工业企业总平面设计规范[S].
  • 9GB 50157 -2013 地铁设计规范[S].
  • 10120101-5,110kV及以下电缆敷设[s].

共引文献8

同被引文献19

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部