摘要 重载铁路随着轴重的提高,对轨下基础的要求也相应提高,对过渡段的要求也更为严格。以湖南柘溪水电站过坝滑道轨道改造工程为背景,研究超重载(轴重45 t)轨道过渡段受力状况。在理论分析的基础上,应用数值模拟仿真分析。研究结果表明:新设计的橡胶-桥梁钢板组合结构的橡胶取30 mm,其弹性模量取20 MPa是合适的。提出的处理措施具有一定的实际应用价值,可以直接运用于实际重载铁路工程的过渡段,以缓解轮轨之间的冲击作用。 With the increase of the axle load of heavy railway,more stringent requirements are required for the rail foundation in the transition section.This paper was based on the subprojects of Hunan Zhexi Hydropower Station dam slide track reconstruction project,and the study on overload(axle load of 45 tons)track transition stress condition was conducted.On the basis of theoretical analysis,numerical simulation was used to analyze.In the new design of composite structure of rubber-bridge steel plate,the thickness of rubber 30mm,its elastic modulus 20 MPa is appropriate.The treatment measures proposed in this paper have certain practical value,and can be directly applied to the transition section of actual heavy haul railway engineering to alleviate the impact between wheel and rail.
作者 王新明 WANG Xinming(China Railway 11th Bureau Group Co.Ltd,Wuchang 430061,China)
出处 《铁道科学与工程学报》 CAS CSCD 北大核心 2018年第3期589-596,共8页 Journal of Railway Science and Engineering
基金 湖南省电力公司研究基金资助项目(HNDL-FW-2012-06)
关键词 重载铁路 超重载 过渡段 橡胶 组合结构 heavy haul railway super overloading transition section rubber composite structure
  • 相关文献

参考文献14

二级参考文献67

共引文献183

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部