摘要
桥梁建设中,现浇预应力箱梁具备独特的施工优势,结合工程实例,从基础施工展开论述,着重阐述了满堂支架预应力箱梁桥的施工工艺和关键技术,提出施工技术人员必须明确其基本特征,细化施工流程,强化施工管理,进而全面优化桥梁项目的建设质量。
In the construction of bridge,cast-in-place prestressed box girder has the unique advantage of construction,combining with examples from the foundation construction,emphatically analyzed expounds the construction technology of prestressed box girder bridge full framing and key technology,put forward the construction technical personnel must clear its basic characteristics,detailed construction process,to strengthen the construction management,and comprehensive optimization of the construction quality of bridge project.
作者
师小青
Shi Xiaoqing(Shanxi Luqiao Second Engineering Co.,Ltd, Linfen 041000, China)
出处
《山西建筑》
2018年第7期181-182,共2页
Shanxi Architecture
关键词
满堂支架
预应力箱梁桥
施工技术
full support
prestressed box girder bridge
construction technology