摘要
以某新建高速铁路单双线桥梁交叉地段箱梁预制场设计为研究背景,在满足工期需求的条件下,对箱梁预制场的结构形式和规模进行研究,确保合理控制工期及投资。
In order to meet the requirement of construction period and ensure reasonable control of construction period and investment,this paper has studied on the design of box girder fabrication and storage yard in the crossing area of the single and double track bridge of a new high speed railway project.
作者
张金禹
Zhang Jinyu(China Railway Design Corporation ^ Institute of Engineering Economics Management & Design, Tianjin 300142, China)
出处
《山西建筑》
2018年第7期190-192,共3页
Shanxi Architecture
关键词
交叉地段
箱梁
工期
方案
crossing area
box girder
period
scheme