零功率物理试验期间主控室操纵员的配合

Coordination of master control room operators during zero-power physics testing
下载PDF
导出
摘要 零功率物理试验是换料大修结束后按技术规格书要求需进行的试验,共8项,且每项试验在其过程中均有保持反应堆相关参数稳定的要求,如操作不当,轻则有可能导致试验失败,重则可能导致反应堆停堆。本文作者通过对每项试验进行分析,归类试验中需主控室操纵员配合的操作,并对此类操作进行描述,以降低试验失败或停堆的可能。 The zero-power physics test is a test to be carried out according to the technical specifications after the refueling overhaul,a total of eight,and each test in the process have the requirements to maintain the stability of the relevant parameters of the reactor,such as improper operation,light It may lead to failure of the test,which may lead to reactor shutdown.The author of this article analyzes each test,categorizes the operations that the master control room operator needs to cooperate in,and describes such operations to reduce the possibility of failure or shutdown.
作者 赵溪 张旭 张晓斌 ZHAO Xi ;ZHANG Xu ;ZHANG Xiao-bin(Nuclear Nuclear Power Operations Management Co., Ltd., Haiyan, Zhejiang 314300, China)
出处 《科技视界》 2018年第3期218-219,共2页 Science & Technology Vision
关键词 零功率 物理试验 主控室操纵员 操作 Zero power Physical test Control room operator Operation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部