在复杂地质及多风险源地段修建地铁车站,传统的暗挖工法不能满足施工需要,STS(steel tube slab)管幕工法作为一种修建超浅埋地铁暗挖车站的新型施工方法被提出。以STS管幕结构修建沈阳地铁某车站为依托,结合现场施工,通过现场试验和监测对顶管过程中的注浆减阻、管间掏土、螺栓连接、混凝土灌注和地表沉降等进行研究,解决了钢管顶进准确定位的难题和大直径带翼缘板钢管减阻问题,得到清理管间土和混凝土灌注的施工方法,并确保了STS管幕工法修建地铁暗挖车站管幕结构的成功实施。
The traditional mining method can not meet the requirements of tunnel construction in complex geology and area with multiple risk sources.As a result,the steel tube slab(STS)pipe curtain method,a new construction method for ultra-shallow buried metro stations is proposed.The drag reduction by grouting,soil cleaning between steel tubes,bolt connection,concrete pouring and ground surface settlement during pipe jacking of a metro station in Shenyang constructed by STS pipe curtain method are studied by field test and monitoring.And then a series of problems have been solved;a series of technologies have been developed;therefore the successful construction of mined metro station by STS pipe curtain method has been guaranteed.
作者
赵文
董驾潮
贾鹏蛟
石建军
肖俊航
刘强
ZHAO Wen;DONG Jiachao;JIA Pengjiao;SHI Jianjun;XIAO Junhang;LIU Qiang(School of Resources and Civil Engineering,Northeastern University,Shenyang 110819,Liaoning,China;The Third Engineering Co.,Ltd.of China Railway Seventh Group,Xi′an 710032,Shaanxi,China)
出处
《隧道建设(中英文)》
北大核心
2018年第1期72-79,共8页
Tunnel Construction
基金
国家自然科学基金资助项目(51578116)
中央高校基本科研业务专项资金资助(N160106006)
关键词
STS管幕工法
超浅埋暗挖地铁车站
钢顶管
注浆减阻
混凝土灌注
地表沉降
steel tube slab(STS)pipe curtain method
ultra-shallow buried mined metro station
steel pipe jacking
drag reduction by grouting
concrete pouring
ground surface settlement