期刊文献+

大体积混凝土智能温控系统在丰满水电站重建工程中的应用 被引量:8

Application of mass concrete intelligent temperature control system in Fengman Hydropower Station Reconstruction Project
下载PDF
导出
摘要 丰满水电站重建工程采用大体积碾压混凝土快速筑坝技术,温度控制是碾压混凝土浇筑质量的控制重点和难点。本文主要通过介绍智能温控系统在丰满水电站重建工程中的应用,阐述智能温控系统对混凝土温度控制管理工作带来的变化,总结系统软件的管理工作经验,以期为其他类似工程提供借鉴。 Mass RCC concrete rapid dam construction technology is adopted in Fengman Hydropower Station reconstruction project.Temperature control is the control key and difficult point for RCC concrete pouring quality.In the paper,the application of intelligent temperature control system in Fengman Hydropower Station reconstruction project is mainly introduced,the changes to concrete temperature control management work due to intelligent temperature control system are described,and the management work experience of the system software is summarized in order to provide reference for other similar projects.
作者 田政 姚宝永 李琦 TIAN Zheng;YAO Baoyong;LI Qi(China Water Conservancy and Hydropower Construction Engineering Consulting Beijing Co.,Ltd., Beijing Chaoyang 100024,China;China Water Conservancy and Hydropower No.16 Engineering Bureau Co.,Ltd.,Fuzhou 350003,China)
出处 《水利建设与管理》 2018年第2期57-60,77,共5页 Water Conservancy Construction and Management
关键词 丰满水电站重建工程 智能温控系统 软件管理 Fengman Hydropower Station reconstruction project intelligent temperature control system software management
  • 相关文献

同被引文献129

引证文献8

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部