期刊文献+

闹德海水库防洪标准复核分析评价 被引量:4

Analysis and evaluation on flood control standard review of Naodehai Reservoir
下载PDF
导出
摘要 针对闹德海水库近年来流域来水量少,泥沙淤积量大,严重影响水库防洪安全的实际,利用延长的水库实测水文资料系列和现行调洪计算条件进行设计洪水复核、坝顶超高复核和泄洪建筑物安全复核。结果表明:大坝实际抗洪能力能够满足原设计防洪标准和国家现行规范要求,发生最大泄量时可安全下泄。 The prolonged reservoir measured hydrology data series and current conditions of flood regulating calculation are adopted for reviewing design flood,dam crest super-elevation and overflow structure in view of the practice that less river basin incoming water and high silt sedimentation in Naodehai Reservoir seriously affect reservoir flood control safety in recent years.The results show that the actual flood resistance capacity of the dam can meet the requirements in original design flood control standards and national current standards,and safe discharge can be achieved during maximum discharge.
作者 张立武 ZHANG Liwu(Liaoning Naodehai Reservoir Authority,Fuxin 123000,China)
出处 《水利建设与管理》 2018年第2期78-80,92,共4页 Water Conservancy Construction and Management
关键词 设计洪水 泄洪建筑物 抗洪能力 安全下泄 design flood flood discharge building flood resistance ability safe discharge
  • 相关文献

同被引文献24

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部