期刊文献+

变形缝墙体模板加固施工新技术 被引量:2

New Technology of Strengthening Construction of Wall Formwork at the Deformation Joint
下载PDF
导出
摘要 目前,大部分施工单位多数采用两种施工工艺进行施工,即错层法施工、变形缝处填塞泡沫板或是聚苯板等柔性材料。以上两种方法存在质量控制极其困难,混凝土成品质量极差,施工进度缓慢、成本较高等诸多问题。因此采用新型的变形缝模板加固施工新技术迫在眉睫,遵义实地·蔷薇国际项目针对上述变形缝两种传统施工方法进行分析与汇总,设计出变形缝加固与拆除专业锚具并制定出切实可行的施工技术措施方案。 At present,most of the construction units adopt two kinds of construction techniques to carry out the construction,that is,the staggered-layer construction,and packing flexible materials such as foam plate or polystyrene plate at the deformation joint.There are many problems existing in the above two methods,such as the quality contro is extremely difficult,and the quality of the finished concrete is very poor,construction progress is slow,high cost and so on.Therefore,it is imminent to adopt a new deformation joint template reinforcement construction technology.Zunyi Shidi.Qiangwei international project analyzes and summarizes the two traditional construction methods for deformation joints,and made a practical and feasible construction technical scheme for deformation joint reinforcement and removal of professional anchor.
作者 李科君 康磊 查开鹏 LI Ke-jun;KANG Lei;ZHA Kai-peng(The Third Construction Engineering Company Co.Ltd.of China Construction Second Engineering Bureau,Chengdu 610045,China)
出处 《中小企业管理与科技》 2018年第8期165-166,共2页 Management & Technology of SME
关键词 变形缝 模板加固 施工技术 经济分析 deformation joint formwork reinforcement construction technology economic analysis
  • 相关文献

参考文献1

二级参考文献2

  • 1JGJl62-2008,建筑施工模板安全技术规范[S].
  • 2GB50204-2015,混凝土结构工程施工质量验收规范[S].

共引文献3

同被引文献8

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部