摘要
通过对大宁调蓄水库泵站试运行全过程分析,总结泵站试运行的成功经验,梳理运行过程中暴露的问题,有针对性的提出解决方法和建议。
Based on the whole process analysis of the commissioning of the pumping station of the Daning reservoir,the successful experience is summarized.Finally,the corresponding solutions and suggestions are proposed according to the practical situation.
作者
孙昊苏
SUN Hao-su(Daning Management Office of the Beijing South-north Water Diversion,Beijing 102442,China)
出处
《价值工程》
2018年第10期95-96,共2页
Value Engineering
关键词
泵站试运行
应急供水
大宁调蓄水库
南水北调
commissioning of the pumping station
emergency water supply
Daning surge tank
south-north water diversion