期刊文献+

浅谈浅埋富水膨胀土隧道施工止水技术

On the Waterproofing Technology in the Construction of Shallow Buried Expansive Soil Tunnel
下载PDF
导出
摘要 在隧道施工过程中,地质条件是影响施工进度和质量的重要因素。因此,在施工前充分考虑地质条件,采用合理的施工方法尤为重要。结合皂树岭一号、二号两座隧道施工,提出深孔注浆堵水的方法及施工注意事项,对今后类似工程的施工具有指导意义。 In the process of tunnel construction,geological conditions are important factors affecting the construction progress and quality.Therefore,it is particularly important to fully consider the geological conditions and adopt reasonable construction methods before construction.Combined with the construction of the No.1 and No.2 tunnels in Zaoshuling,the method of blocking water in deep hole grouting and construction precautions are proposed,which will be instructive for the construction of similar projects in the future.
作者 周成成 ZHOU Cheng-cheng(China Railway No.7 Bureau Group Xi'an Engineering Co.,Ltd.,Ankang 725005,China)
出处 《价值工程》 2018年第11期147-148,共2页 Value Engineering
关键词 浅埋 膨胀土 注浆 堵水 shallow buried expansive soil grouting plugging water
  • 相关文献

参考文献4

二级参考文献4

  • 1徐祯祥 刘月芬.高地应力地区隧道支护衬砌的受力特性研究[J].铁道工程学报,1996,.
  • 2陈湘君.软弱膨胀围岩隧道设计与施工[C].中国土木工程学会论文集,1994.
  • 3吴承三.目前隧道工程中急待解决的几个问题[C].中国土木工程学会论文集,1994.
  • 4赵子荣.软弱围岩铁路隧道仰拱作用的试验研究[C].中国土木工程学会论文集,1994.