摘要
在隧道施工过程中,地质条件是影响施工进度和质量的重要因素。因此,在施工前充分考虑地质条件,采用合理的施工方法尤为重要。结合皂树岭一号、二号两座隧道施工,提出深孔注浆堵水的方法及施工注意事项,对今后类似工程的施工具有指导意义。
In the process of tunnel construction,geological conditions are important factors affecting the construction progress and quality.Therefore,it is particularly important to fully consider the geological conditions and adopt reasonable construction methods before construction.Combined with the construction of the No.1 and No.2 tunnels in Zaoshuling,the method of blocking water in deep hole grouting and construction precautions are proposed,which will be instructive for the construction of similar projects in the future.
作者
周成成
ZHOU Cheng-cheng(China Railway No.7 Bureau Group Xi'an Engineering Co.,Ltd.,Ankang 725005,China)
出处
《价值工程》
2018年第11期147-148,共2页
Value Engineering
关键词
浅埋
膨胀土
注浆
堵水
shallow buried
expansive soil
grouting
plugging water