摘要
在国家政策大力推动下,地下综合管廊建设发展迅速,综合管廊工程投资大,投资方面临较大的资金压力。文章分析综合管廊的造价水平及造价构成,探讨建设条件、与地下工程协调建设、断面尺寸、管廊埋深、老旧管线迁移、施工方法等因素对造价水平的影响。为管廊工程的规划设计、估算编制、造价管理提供参考,为有效控制综合管廊造价及管廊工程的可持续发展提供帮助。
Under the vigorous promotion of national policies,the construction of underground pipe gallery with large investment has developed rapidly.The investors face greater financial pressure.The article analyzed the cost level and cost composition of the UPG,and discussed the influence of the construction conditions,coordination with the underground project,section size,dwell depth,the old pipelines migration to the cost level.It provides a reference for the planning and design of UPG,the estimated preparation and the cost management,and helps to control the cost of UPG effectively and the sustainable development of the UPG.
作者
夏同令
张世浪
XIA Tongling;ZHANG Shilang(China Energy Engineering Group Guangdong Electric Power Design Institute Co.,Ltd.,Guangzhou 510663,China)
出处
《南方能源建设》
2017年第A01期154-157,共4页
Southern Energy Construction
关键词
综合管廊
工程造价
造价影响因素
underground pipe gallery
project costs
factors affecting the cost