长江干线船舶延误风险 被引量:1

Risk of Vessel Delay in Yangtze River Trunk Waterways
下载PDF
导出
摘要 与海上运输相比,导致长江上航行船舶延误的因素更多、更复杂,进行延误风险研究有利于提高船舶的准班率和航运服务水平。将综合风险评估体系运用于船舶延误研究中,进行全面、多次、逐步深入的专家调查,构建长江干线船舶延误风险分析体系。将造成长江干线船舶延误的主要风险因素分为4大类共18种;通过风险评估对风险因素进行等级划分,其中高风险因素来源分散,控制风险要多方配合,前五大因素风险值占总风险的54%,应重点关注。以长江干线典型航运企业生产运营实际为例进行实证研究,验证延误风险研究的有效性,说明多方重视并辅以有效的风险控制措施效果明显。 Risk factors of vessel delay in the waterways of the Yangtze River are more complicated than that in marine transportation.Systematic research on vessel delays is an effective approach to improve the punctuality rate.A delay risk analysis system for the Yangtze River trunk waterways is set up with system risk assessment theories.Four categories covering 18 risk factors are identified.Risk levels of the delay risk factors are graded and high risk factors are assessed.Risk mitigation proposals are offered.The effectiveness of delay risk analysis system is verified with the case of a typical shipping enterprise.
作者 陈琛 吴青 高嵩 CHEN Chen;WU Qing;GAO Song(School of Logistic Engineering,Wuhan University of Technology,Wuhan 430070,China;School of Logistics and Trade,Wuhan Business University,Wuhan 430056,China;Intelligent Transport System Research Center,Wuhan University of Technology,Wuhan 430063,China;National Engineering Research Center for Water Transport Safety,Wuhan University of Technology,Wuhan 430063,China)
出处 《中国航海》 CSCD 北大核心 2018年第1期98-102,112,共6页 Navigation of China
基金 交通运输部建设科技项目(2015328811180)
关键词 水路运输 船舶延误 风险分析 风险识别 风险评估 waterway transportation risk of vessel delay risk analysis risk identification risk assessment
  • 相关文献

参考文献9

二级参考文献98

共引文献110

同被引文献6

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部