摘要
大渡河流域双江口水电站坝区工程地质条件复杂、地质信息众多,对工程勘探、设计及施工建设等带来了极大困难。为解决此类复杂的工程与地质问题,实现复杂地质体可视化,利用地质勘探信息建立三维地质模型,并基于纹理映射、碰撞检测、射线检测等可视化交互技术,实现三维地质的三维空间关系分析、虚拟钻孔分析及任意断面的实时剖切。研究和实践表明该方法可实现三维地质模型与现实地质体的有效信息链接和可视化交互分析,为工程地质分析、地质预测等提供基础,可有效提高工程勘探、设计与施工的信息化管理水平和效率。
As the highest dam in the world,the high-core wall rockfill dam of Shuangjiangkou hydropower station in Dadu River has complicated geological condition with numerous geological information,which arise great difficulties for engineering exploration,design and construction.A 3D geological model is established on the basis of the geological prospecting information,aiming at solving these complicated engineering and geological problems.Based on the visual interaction techniques,such as texture mapping,collision detection and ray detection,three-dimensional spatial relationship analysis,virtual borehole analysis,and real-time cutting of arbitrary cross section are carried out.It shows that this research can achieve the linkage of effective information and mutual visualization analysis between 3D geological model and real geologic body.This method provides a foundation for engineering geology analysis and geological prediction,and improves the efficiency of engineering surveys,design,constructions and information management.
作者
唐茂颖
黄润秋
吕明明
邹元品
TANG Maoying;HUANG Runqiu;Lu Mingming;ZOU Yuanpin(State Key Laboratory of Geohazard Prevention and Geoenvironment Protection,Chengdu University of Technology,Chengdu 610059,China;Dadu River Hydropower Development Co.,Ltd.,State Electricity Company,Chengdu 610041,China;State Key Laboratory of Hydraulic Engineering Simulation and Safety,Tianjin University,Tianjin 300072,China)
出处
《成都理工大学学报(自然科学版)》
CAS
CSCD
北大核心
2018年第2期239-249,共11页
Journal of Chengdu University of Technology: Science & Technology Edition
基金
国家重点基础研究发展计划(973)项目(2013CB733202)
关键词
三维地质建模
可视化
双江口水电站
地质空间分析
任意断面实时剖切
3D geological modelling
visualization
Shuangjiangkou hydropower station
geological space analysis
real-time cutting of arbitrary cross section