4Tiong RLK and Alum J. Final negotiation in competitive BOT tender [J]. Journal of Construction Engineering and Management, 1997, 123(1): 6-10.
5Rahman MM and Kumaraswamy MM. Risk management trends in the construction industry: moving towards joint risk management[J]. Engineering Construction and Architectural Management, 2002(2): 131-151.
6Milner M. Eurotunnel car traffic declines[N]. The Guardian, 21 March, 2004: 14.
7Lam KC, Wang D, Lee PTK and Tsang YT. Modeling risk allocation decision in construction contracts[J]. International Journal of Project Management, 2007 (25): 485-493.
8Oudot JM. Risk-allocation: theoretical and empirical evidences, application to public-private partnerships in the defense sector[C]. The 9th annual conference of the institutions of market exchange, Barcelona, Spain, 2005, June 23-25.
9Loosemore M, Raftery J, Reilly C and Higgon D. Risk management in projects [M]. London: Taylor & Francis, 2006.
10Ng A and Loosemore M. Risk allocation in the private provision of public infrastructure[J]. International Journal of Project Management, 2007, 25(1): 66-76.