期刊文献+

大断面综放工作面巷道煤柱宽度探讨

Probe into Heading Chain Pillar Width and Surrounding Rock Control of Large Section at Fully Mechanized Caving Face
下载PDF
导出
摘要 应用FLAC3D模拟软件对西山煤电集团公司东曲矿22108工作面进行三维结构受力特性模拟和塑性流动分析,以及对综放工作面巷道合理布置进行探讨,认为合理煤柱宽度为20 m,能够有效保障煤柱巷道围岩稳定。 The application of FLAC3D simulation software of Dongqu Coal Mine of Xishan coal electricity group company in 22108 working face were analyzed and simulated the three-dimensional structure of the plastic flow stress,as well as the layout of roadway of fully mechanized caving face are discussed,that the reasonable coal pillar width is 20 m,and it can guarantee the stability of surrounding rock of coal pillar roadway.
作者 武慧龙 Wu Huilong(Xiqu Colliery,Shanxi Xishan Coal and Electricity Group Co.,Shanxi 030200)
出处 《江西煤炭科技》 2018年第1期45-46,51,共3页 Jiangxi Coal Science & Technology
关键词 综放工作面 巷道煤柱 数值模拟 围岩控制 fully mechanized caving face heading chain pillar numerical simulation surrounding rock control
  • 相关文献

参考文献5

二级参考文献24

共引文献218

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部