外高桥六期工程商品汽车码头自动化立体整车仓库设计 被引量:1

Mechanical automated stereo garage design of Waigaoqiao Port phase Ⅵ project
下载PDF
导出
摘要 通过对外高桥六期工程商品汽车码头自动化立体整车仓库项目中影响自动仓库总体规划设计的布局模式、智能控制、作业流程等因素进行分析,特别针对自动化立体整车仓库的工艺流程系统和流程自动控制系统进行剖析,提出自动化立体整车仓库切实可行的规划设计思路和策略,为同类自动化仓库设计提供实践经验及参考。 The paper analyzes the layout,intelligence control and working procedure in the mechanical automated stereo garage project of Shanghai Waigaoqiao Port phase VI project which influence the overall planning and design of the mechanical automated stereo garage,probes into the automated control system of the process system and process automated control system of the garage,and puts forward design ideas and strategies for the mechanical automated stereo garage,could be a practical reference to the field of mechanical automated garage.
作者 倪立土 NI Li-tu(Shanghai International Port(Group)Co.,Ltd.Construction Headquarters,Shanghai 200136,China)
出处 《水运工程》 北大核心 2018年第2期81-86,共6页 Port & Waterway Engineering
关键词 自动化整车仓库 工艺流程系统 流程自动控制系统 automatic garage process system process automated control system
  • 相关文献

参考文献5

二级参考文献12

共引文献49

同被引文献3

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部