火车卸原油栈桥工艺计算及设计 被引量:1

Calculation and Design of Unloading Crude Oil Trestle Process by Train
下载PDF
导出
摘要 原油装卸系统设计过程中,根据炼油厂的炼油能力、管道的输送能力、油库的储存能力等确定原油装卸能力、装卸油工艺选择、栈桥尺寸等问题。本文结合实际设计经验,阐述了原油卸油栈桥的设计过程和设备选择,并对零位罐容积的计算进行了重点介绍及设计中应注意的问题。 During the design process of crude oil loading and unloading system,the crude oil loading and unloading capacity,oil loading and unloading process selection,trestle size and other issues are determined according to the refinery oil refining capacity,pipeline transportation capacity,oil depot storage capacity,etc.Combining with practical design experience,this paper expounds the design process and equipment selection of crude oil unloading trestle,and emphatically introduces the calculation of zero tank volume and some problems needing attention in the design process.
作者 甘泉 Gan Quan(Lanzhou Huanqiu Engineering CO.,LTD.,Gansu,730060)
出处 《当代化工研究》 2017年第12期96-97,共2页 Modern Chemical Research
关键词 火车 卸油 零位罐 卸油栈桥 鹤位 trains oil unloading zero tank oil unloading trestle crane position
  • 相关文献

参考文献1

二级参考文献1

共引文献16

同被引文献12

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部