期刊文献+

闹德海水库水沙联合调度模拟研究 被引量:3

Simulation Study on Joint Dispatching of Water and Sediment in Naodehai Reservoir
下载PDF
导出
摘要 为解决柳河防洪排沙与兴利蓄水之间的矛盾,在满足防洪要求的前提下,减少泥沙淤积,增加蓄水量,本文通过对闹德海水库20场洪水调查,采用BP神经网络模型对20场洪水在各汛限控制水位下的排沙量进行模拟计算,为水库的水沙联合调度提供了科学的依据。 The sediment deposition is reduced,and the water storage capacity is increased under the precondition of meeting flood control requirements in order to solve the contradiction between Liuhe River flood control de-silting and water conservancy impoundment.In the paper,BP neural network model is adopted for simulating and calculating the discharged particle mass of 20 floods under different flood control water levels through investigating 20 floods in Naodehai Reservoir,thereby providing scientific basis for water and sediment joint dispatching in the reservoir.
作者 韩丛利 HAN Congli(Liaoning Fuxin Hydrology Bureau,Fuxin 123000,China)
出处 《中国水能及电气化》 2018年第3期15-18,共4页 China Water Power & Electrification
关键词 闹德海 淤积 BP神经网络 调度 Naodehai deposition BP neural network dispatching
  • 相关文献

参考文献8

二级参考文献32

共引文献45

同被引文献29

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部