需求不确定的设施选址与多阶段生产鲁棒模型研究 被引量:2

Facility location and multi-period production problem considering robustness
下载PDF
导出
摘要 选址决策是长期的战略性问题,在选址问题中考虑不确定因素至关重要。假设需求取值于有界的对称区间,在设施选址与多阶段生产问题中提出一种新的鲁棒性方法,通过调节不确定预算来权衡解的鲁棒性与系统成本之间的关系。该鲁棒问题不仅能够转换成线性规划,而且可以计算出设施的最低服务水平。通过随机生成数值算例,得出不同鲁棒水平下拓扑结构截然不同的设施网络,并分析服务水平与成本之间的权衡关系,同时对需求的不确定水平作了敏感性分析。 Facility location problems are long term strategic decisions.It is important to consider uncertainty in the facility location modeling.This paper assumed that the demand was within a bounded and asymmetric interval.This paper used a new robust approach to solve the facility location and multi-period production problem.The trade-offs between the robustness of the solution and the cost could be done by adjust the budget of uncertainty.The presented robust model not only could be transformed to a liner programming,but also could obtain the service level of the facility.At last,randomly generated numerical examples illustrated the different network topology for different robustness level.Moreover,it analyzed the trade-offs between the service level and the cost.The research also made the sensitivity analysis of the uncertain level.
作者 刘慧 杨超 宋广华 Liu Hui;Yang Chao;Song Guanghua(Research Center of Hubei Logistics Development,Hubei University of Economics,Wuhan 430205,China;School of Management,Huazhong University of Science&Technology,Wuhan 430074,China;School of Information&Safety Engineering,Zhongnan University of Economics&Law,Wuhan 430073,China)
出处 《计算机应用研究》 CSCD 北大核心 2018年第3期760-764,共5页 Application Research of Computers
基金 国家教育部人文社会科学研究青年基金资助项目(15YJC630074)
关键词 设施选址与生产计划 不确定预算 鲁棒水平 服务水平 facility location and production planning budget of uncertainty degree of robustness service level
  • 相关文献

参考文献3

二级参考文献31

  • 1李延晖,马士华.基于时间约束的单源/p个中转点配送系统的MINLP模型[J].中国管理科学,2004,12(3):86-90. 被引量:12
  • 2陈志宗,尤建新.重大突发事件应急救援设施选址的多目标决策模型[J].管理科学,2006,19(4):10-14. 被引量:90
  • 3钱颂迪.运筹学[M].北京:清华大学出版社,2005..
  • 4Daskin M S, Stern E H. A hierarchical objective set covering model for emergency medical service vehicle deployment[J]. Transportation Science, 1981, 15(2): 137-152.
  • 5Berman O, Verter V, Kara B Y. Designing emergency response networks for hazardous materials transportation[J]. Computers & Operations Research, 2007, 34(5): 1374-1388.
  • 6Schilling D A. Strategic facility planning: The analysis of options[J]. Decision Sciences, 1982, 13: 1-14.
  • 7Jornsten K, Bjorndal M. Dynamic location under uncertainty[J]. Studies in Regional and Urban Planning, 1994, 3: 163-184.
  • 8Serra D, Marianov V. The p-median problem in a changing network: The case of Barcelona[J]. Location Science, 1998, 6: 383-394.
  • 9Averbakh I, Berman O. Minimax regret median location on a network under uncertainty[J]. INFORMS Journal on Computing, 2000, 12(2): 104-110.
  • 10Daskin M S, Hesse S M. α-reliable p-minimax regret: A new model for strategic facility location modeling[J]. Location Science, 1997, 5(4): 227-246.

共引文献28

同被引文献18

引证文献2

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部