摘要
应用动态网络分析法进行工期索赔案例分析,通过调研研究对象延期事件,根据调研结果,将工序复杂的大型水利工程进行适当的简化,应用动态网络分析法对比分析合同进度计划、延期进度计划,提出合理工期作为变更索赔的依据。
T h is a rtic le summarizes the a p p lica tio n o f dynam ic netw ork analysis m ethod claim s case study p e rio d,com prehensive researches study postpone the e v e n t,according to the survey re s u lts,the com plex process o f large-scale w ater conservancy projects appropriate to s im p lify the app lic a tio n o f dynam ic netw ork analysis com parative analysis o f the contract sch e d u le,delayed s ch e d u le,reasonable p e riod as the change c la im.
作者
武潇
田园
Wu Xiao;Tian Yuan(North China University of Water Resources and Electric Power,Zhengzhou 450045,China)
出处
《山西建筑》
2018年第8期229-230,258,共3页
Shanxi Architecture
关键词
工期索赔
动态网络分析法
计算方法
period claim
dynam ic network analysis
computing m ethod