文章以中山大学肿瘤防治中心复合手术平台改造项目为例,从项目涉及的既有建筑场地论证、洁净工艺流线、机房放射防护、结构加固、分期周转等方面入手,总结了医院既有建筑改扩建工程中较为复杂的洁净防护手术平台建设项目前期准备工作要点,以期对行业同类项目实施提供参考与借鉴。
Taking the composite surgery platform reconstruction project of Sun Yat-sen University Cancer Center as an example,the article summarizes the preparatory work points for the more complicated clean and protective surgery platform construction project among the building renovation and expansion projects from aspects of existing construction site verification,clean process flow lines,radiation protection of the equipment room,structural reinforcement,and turnover by stages,and provides reference for the implementation of similar projects.