摘要
文章以上海市胸科医院新建科教综合楼为例,介绍了BIM技术和项目管理充分结合进行项目前期、设计、施工准备、施工等全过程以及进度、投资和质量控制全方位BIM应用的具体做法;阐述了BIM应用的组织、管理和信息化应用措施,以及该项目所取得的实际效果。
The article takes the newly constructed science and education complex building of Shanghai Chest Hospital as an example,introduces the full integration of BIM technology and project management in the preliminary stage,design stage,construction preparation and construction,and the concrete practice method of BIM application in progress,investment and quality control;expounds the organization,management and informatization of BIM application,as well as the actual effect of the project.