摘要 平台系统测试工作是平台产品研发阶段的最后一个环节,是保证平台质量的重要手段。通用仪控平台产品发布后将服务于不同的工程应用中,为保证产品满足平台质量的出口要求,保障后端多种工程应用的顺利实施,高效开展平台系统测试工作则显得尤为重要。基于当前在核安全级仪控平台中系统测试技术鲜有提及的现状,本文以广利核公司的核安全级仪控平台Firm Sys(和睦系统)系统测试为背景,通过对相关标准体系的梳理、系统测试过程及仪控平台安全特性的分析,提出了一种基于安全特性的核电仪控平台系统测试。最后,通过对和睦系统开发及应用过程的实例验证,表明所提出的系统测试能有效提高平台产品的控制质量,提升平台产品在后端的工程适用性。 Platform system testing is the last link of product research and development,It is the im portant method to ensure the quality of the platform system.It will be used in different engi-neering projects after the General I&G Platform is developed.In order to ensure the product meets the quality requirements,and the smooth implementation of engineering application,Effectivly system testing is very important.Based on current situation of that test techniques are rarely mentioned.By combing relevant standards and in-depth technical researching,Put forward a system testing technique.Finally,it is verified by the example that it can effectively improve the platfonn products quality and improve the engineering applicability.
作者 闫娟 吴瑶 Yan Juan;Wu Yao(China Techenergy Co”Ltd.,Beijing,100094,China)
出处 《仪器仪表用户》 2018年第5期68-71,共4页 Instrumentation
关键词 核安全级 仪控平台 系统测试 nuclear safety-clas I&G platrorm system test
  • 相关文献

参考文献4

二级参考文献35

  • 1李臻.AP1000和EPR仪控系统简介与对比[J].电力科学与工程,2009,25(10):74-78. 被引量:5
  • 2刘鹏飞,林萌,侯东,陈智,杨燕华.核电厂DCS系统功能验证工程模拟机研究[J].核动力工程,2009,30(S1):48-51. 被引量:19
  • 3.田湾核电厂数字化仪控系统说明书[Z].,2002-09..
  • 4IEEE. 1220-1998 IEEE standard for application and management of the systems engineering process [ S ]. Institute of Electrical and Electronics Engineers, Inc, 1998.
  • 5IEEE. 829-1998 IEEE standard for software test documentation[ S ]. Institute of Electrical and Electronics Engineers, Inc, 1998.
  • 6US NRC. RG1. 170 Software test documentation for digital computer software used in safety system of nuclear power plant [ S ]. US Nuclear Regulatory Commission, 1997.
  • 7US NRC. RG1. 171 Software unit testing for digital computer software used in safety system of nuclear power plant [ S ]. US Nuclear Regulatory Commission, 1997.
  • 8ANSI/ASME. N45.2.6 Qualifications of inspection, examination, and testing personnel for the construction phase of nuclear power plants [ S ]. American National Standards Institute, 1978.
  • 9Song Fei, Zhang Shuhui. Human factors engineering verification and validation:a case study of a nuclear power plant [ C] // 18th International Conference on Nuclear Engineering(ICONE18) May 17 - 21,2010, Xi' an, China,2010:715 - 721.
  • 10国家核安全局.HAD102/16-2004核动力厂基于计算机的安全重要系统软件[S].北京:中国法制出版社,2004.

共引文献65

同被引文献10

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部