摘要 从浦东新区建设工程实际情况出发,结合质量问题产生的原因和背景,从影响工程质量的因素、质量主体责任落实、诚信机制等方面展开系统分析,并提出相应的措施。 Combined the causes and backgrounds of construction quality problems,this paper made systematic analysis of the overall quality of construction project in Pudong new area based on the actual situation of Pudong new area construction project from the aspects of influencing factors,the quality of the project,the implementation of the main responsibility for the quality of credit mechanism,and put forward the corresponding measures to further improve the quality of the project.
作者 瞿志勇 QU Zhiyong(Pudong New Area Construction Engineering Safety and Quality Supervision Station,Shanghai 200127,China)
出处 《工程质量》 2018年第4期9-14,共6页 Construction Quality
关键词 分析 监管 质量通病 责任 长效机制 analysis supervision common quality problems responsibility long-term mechanism
  • 相关文献

参考文献3

二级参考文献19

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部