摘要 针对盾构隧道下穿运营铁路工程的实际特点,对其施工风险因素进行了总结分析,建立了基于层次分析法的风险评价结构模型,并进行实例分析与工程应用。结果表明:依托工程下穿施工将存在极大的安全风险,主要风险源分别为因卵石自稳能力差、盾构施工注浆不及时和土仓压力控制不当造成地表沉降,为后续施工风险控制措施的制定提供了直接依据。 According to the actual characteristics of shield tunnel underneath an operational railway, the construction risk factors were summarized and analyzed, and then the risk evaluation model was put forward using the analytic hierarchy process, also example analysis and engineering application was conducted. The results show that the underneath construction of background project has huge safety risk, and the main risk factors were the ground surface settlement caused by the sand pebble stratum with poor self stability, shield grouting is not timely, and inappropriate earth pressure of chamber. This results can provide an direct basis for design the construction risk control measurements.
作者 崔根群 林大涌 CUI Gen-qun;LIN Da-yong
出处 《建筑机械》 2018年第4期63-67,共5页 Construction Machinery
基金 国家自然科学基金项目(51508575) 中国博士后科学基金项目(2016T90764) 湖南省创新平台与科技人才项目(2015RS4006)
  • 相关文献

参考文献8

二级参考文献57

共引文献230

同被引文献20

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部