摘要
为解决景电工程干渠红砂土基础在地下水浅埋条件下冬季冻胀量大、暖季融沉滑塌严重的问题,对渠道基础采用块石换填的抗冻胀融沉方案。根据地下水埋深与渠基土冻胀、融沉强度的关系,得到冻土的本构方程,采用COMSOL有限元软件对换填前和换填后渠道衬砌的位移场和应力场进行了对比计算。结果表明:换填后的渠坡、渠底衬砌板法向位移最大值相对于换填前分别减小了53.8%、78.0%;换填后,渠道衬砌最大法向冻胀力和切向冻结力相比换填前分别减小了73.2%和82.8%,且整体分布更均匀。在地下水浅埋和土体遇水软化的水文地质条件下,块石换填渠道具基础有优良的抗冻胀融沉效果。
As a result of the largeamount of frost heave in winter and the serious collapse in spring which attributed to the shallow underground water table of arenosol’s foundation,a foundation replacement measure with block stone in the main canal of Jingtai irrigation was proposed for anti-frost heave and anti-thaw settlement.According to the relationship between groundwater depth and frost thawing sink strength of canal base,it got frozen soil’s constitutive equation and it calculated the displacement field and stress field of canal lining that before and after replacement of block stone by using the COMSOL finite element software.The results show that the replacement of canal slope,the canal bottom lining plate method to the maximum displacement value relative to replacement before are reduced by 53.8%and 78.0%respectively;after replacement,the maximum method to frost heaving force of lining and cut to a freezing stress compared to change before filling are reduced by 73.2%and 82.8%respectively and the overall distribution is more uniform.In the condition of shallow groundwater or soil softening encountering water,the effects of freezing-thawing resistance by the block-stone replacement measure for canal are excellent.
作者
刘月
王正中
李甲林
张茂林
申正香
LIU Yue;WANG Zhengzhong;LI Jialin;ZHANG Maolin;SHEN Zhengxiang(College of Water Resources and Architectural Engineering,Northwest A&F University,Yangling 712100,China;Gansu Jingtaichuan Irrigation Management Bureau,Baiyin 730900,China)
出处
《人民黄河》
CAS
北大核心
2018年第4期147-149,156,共4页
Yellow River
基金
国家自然科学基金资助项目(51279168)
"十二五"国家科技支撑计划项目(2012BAD10B02)
冻土工程国家重点实验室开放基金项目(SKLFSE-201105)
关键词
块石换填
抗冻融效果
数值模拟
景电工程
stone replacement
freezing.thawing resisting effect
numerical simulation
Jingdian project