摘要
阐述了马圈沟水库工程分期导流和1次拦断河床,导流洞过流2种施工导流方案,从工程投资、施工工期、导流程序、复杂程度、提前供水效益等方面对2种导流方案做了综合比较。
This paper describes the mews ditch reservoir diversion and a dammed river diversion tunnel,the flow of two kinds of construction diversion schemes.From project investment,construction period,diversion program complexity,advance water efficiency and other aspects,comprehensive comparison of two kinds of diversion scheme have been conducted.
作者
杨造仁
YANG Zaoren(Xinjiang Hydropower Planning&Design Institute,Urumchi 830000,China)
出处
《广东水利水电》
2018年第2期39-41,45,共4页
Guangdong Water Resources and Hydropower
关键词
施工导流
分期
1次拦断河床
坝体临时断面
施工条件
construction diversion
by stages
one time blocking the river bed
temporary section of dam body
construction conditions