期刊文献+

基于BIM与精益建造的工程建设模式 被引量:4

Engineering Construction Model Based on BIM and Lean Construction
下载PDF
导出
摘要 随着信息技术的不断发展,以精益建造为指导思想,以BIM为手段,交互协调应用在工程项目管理活动中将会是建筑业以后发展的必经之路。论文通过分别对精益建造和建筑信息模型概念和特点的分析,提出了基于BIM和精益建造的工程建设模式。并且分析了如何在工厂建设管理中实现BIM与精益建造交互协同工作。最后提出了最适合"BIM与精益建造"共同发展应用的IPD模式。 With the continuous development of information technology,Lean Construction as the guiding ideology,BIM as the means,interactive and coordinated application in the project management activities will be the only way for the construction industry to develop in the future.Based on the analysis of the concepts and characteristics of lean construction and building information models,the thesis proposes a project construction model based on BIM and lean construction.It also analyzes how to realize the interaction and cooperation between BIM and lean construction in factory construction management.Finally,the IPD model that is most suitable for the common development and application of"BIM and Lean Construction"is proposed.
作者 房子涵 FANG Zi-han(Huaqiao University,Xiamen 361000,China)
机构地区 华侨大学
出处 《价值工程》 2018年第12期77-79,共3页 Value Engineering
关键词 精益建造 BIM IPD lean construction BIM IPD
  • 相关文献

参考文献10

二级参考文献33

  • 1蒋书鸿,苏振民.精益建造:一种先进的建造体系[J].基建优化,2004,25(3):11-13. 被引量:36
  • 2朱连章,杨杰.对象/关系映射的基本策略[J].微计算机应用,2006,27(5):585-589. 被引量:3
  • 3Chuck Eastman, Paul Teicholz, Rafael Sacks,etc. BIM handbook: a guide to building information modeling for owners, managers,designers,engineers and contractors[M]. Second Edition. Hoboken,New Jersey,American & Canada :John Wiley & Sons, Inc, 2011.
  • 4Reza Ghassemi, Burcin Becerik-Gerber. Transitioning to integrated project delivery: potential barriers and lessons learned[J]. Lean Construction Journal 2011,2011:32-52.
  • 5Seongkyun Cho, Glenn Ballard.Last planner and integrated project delivery[J]. Lean Construction Journal 2011,2011: 67-78.
  • 6The Change Business Ltd.What is integrated project delivery^TM? [EB/OL]. http://www.thechangebusiness.co.uk/TCB/ Integrated_Project_Delivery_files/What -is -Integrated - Project-Delivery3.pdf.
  • 7Ryan E.Smith,Alan Mossman,Stephen Emmitt. Editorial lean and integrated project delivery [J]. Lean Construction Journal 2011,2011 : 1-16.
  • 8Yong-Woo Kim,Carrie Sturts Dossick.What makes the delivery of a project integrated?A case study of children's hospital,bellevue,WA[J].Lean Construction Journal 2011, 2011:53-66.
  • 92011LeanConstructionlnstitute.LCI Research [EB/OL].http: //www.leanconstruction.org/research.html.
  • 10Karen Wilhelm.Collaboration makes construction lean [J]. Target, 2007,23 (5) : 4-11.

共引文献85

同被引文献29

引证文献4

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部